Allied Power Logo

Dominion Engineering

RSCS Logo

Nucler Plant Long-Term Asset Management

Intake Structure Inspections Strengthen Understading and Support Long-Term Repair Planning

Project Snapshot

RSCS, in collaboration with CorrTech, a speciality corrosion engineering firm, completed above waterline intake structure inspections across a two unit generating station to support repair planning and long-term asset management. Using visual assessments, nondestructive testing, field documentation, and model-based tracking, the team identified concrete, moisture, and corrosion concerns while confirming that the inspected structures were generally fit for continued service. Findings provided engineering teams with clear priorities for targeted repairs, work planning, corrosion mitigation, monitoring, and future outage planning.

RSCS Method

RSCS documented concrete conditions in the intake bays and supporting intake structure areas. Visual surveys, sounding, ultrasonic thickness testing, depth to rebar, photo documentation, sketches, and nondestructive concrete testing were all used to evaluate condition mechanisms identified in nuclear safety-related concrete guidance.

Both intake structures were found to be generally fit for continued service, but the inspections identified localized conditions captured for engineering review, monitoring, and future outage planning. Inspections also supported action reporting and repair prioritization.

Photos, field notes, marked inspection sketches, and digital model records were used to connect observed conditions with precise locations. The Unit 1 work incorporated a three-dimensional Revit model, while Unit 2 findings were digitized for future structural documentation. This improves continuity between inspection evidence, repair boundaries, monitoring history, and future asset-management decisions.

Long-Term Value for the Station

The combined inspections translated field observations into a practical path for aging-management work. By separating localized repair needs from broader structural replacement concerns, the project helps the station improve planning confidence, align maintenance scope with real conditions, reduce FME and corrosion-related uncertainty, and preserve reliable intake structure performance through monitoring and remediation.